Unified control center integrating 11 subsystems with 413,000+ tags and 1,600+ cameras.
Industry: Transportation / Infrastructure
| Attribute | Value |
|---|---|
| Customer | Major highway concessionaire — toll road operator |
| Scale | 413,882 tags, 85,400 communication points, 1,605 cameras |
| Subsystems | 11 integrated (ventilation, traffic, toll, cameras, HVAC, utilities, emergency, signage, access, PA) |
| Architecture | Dual-server redundancy, 7 protocols, 56 channels |
| Displays | 261 operator screens |
| Status | 24x7 continuous operation |
Challenge: Integrate 11 critical highway subsystems into a unified operations center with real-time monitoring, coordinated response, and high availability for safety-critical infrastructure.
Specific pain points:
Impact: Increased incident response times, higher operational costs due to multiple control rooms, safety risks from uncoordinated subsystem responses, and reduced highway capacity during emergencies.
| Tier | Component | Capabilities |
|---|---|---|
| Central | FrameworX Enterprise (dual-server) | Unified platform, 11 subsystems, 24x7 operation, unlimited clients |
| Field | 19 Altus PLCs + cameras + subsystems | Distributed control across highway infrastructure |
| Clients | 261 operator displays | Real-time monitoring and control |
<svg xmlns="http://www.w3.org/2000/svg" viewBox="0 0 1000 650" width="100%" height="auto" style="max-width: 1000px;" preserveAspectRatio="xMidYMid meet">
<defs>
<linearGradient id="fieldGrad" x1="0%" y1="0%" x2="0%" y2="100%">
<stop offset="0%" style="stop-color:#48bb78"/>
<stop offset="100%" style="stop-color:#2f855a"/>
</linearGradient>
<linearGradient id="protocolGrad" x1="0%" y1="0%" x2="0%" y2="100%">
<stop offset="0%" style="stop-color:#ed8936"/>
<stop offset="100%" style="stop-color:#c05621"/>
</linearGradient>
<linearGradient id="serverGrad" x1="0%" y1="0%" x2="0%" y2="100%">
<stop offset="0%" style="stop-color:#4299e1"/>
<stop offset="100%" style="stop-color:#2b6cb0"/>
</linearGradient>
<linearGradient id="outputGrad" x1="0%" y1="0%" x2="0%" y2="100%">
<stop offset="0%" style="stop-color:#805ad5"/>
<stop offset="100%" style="stop-color:#553c9a"/>
</linearGradient>
<filter id="shadow" x="-10%" y="-10%" width="120%" height="120%">
<feDropShadow dx="2" dy="2" stdDeviation="3" flood-opacity="0.15"/>
</filter>
</defs>
<!-- Background -->
<rect width="1000" height="650" fill="#f8fafc"/>
<!-- Title -->
<text x="500" y="40" text-anchor="middle" font-family="Arial, sans-serif" font-size="24" font-weight="bold" fill="#1a365d">Highway Operations - Data Flow</text>
<!-- LAYER 1: Control Room (Top) -->
<g filter="url(#shadow)">
<rect x="250" y="60" width="500" height="90" rx="12" fill="url(#outputGrad)"/>
<text x="500" y="93" text-anchor="middle" font-family="Arial, sans-serif" font-size="16" font-weight="bold" fill="white">CONTROL ROOM</text>
<text x="500" y="120" text-anchor="middle" font-family="Arial, sans-serif" font-size="13" fill="#e9d8fd">Operators | Display Screens | Alarms</text>
<text x="500" y="140" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" fill="#d6bcfa">24/7 Monitoring and Control</text>
</g>
<!-- Down arrow to servers -->
<g fill="none" stroke="#4a5568" stroke-width="3" stroke-linecap="round" stroke-linejoin="round">
<path d="M500 155 L500 195 M488 183 L500 195 L512 183"/>
</g>
<text x="530" y="180" font-family="Arial, sans-serif" font-size="11" fill="#718096">Visualization and Alarms</text>
<!-- LAYER 2: Central Server System -->
<g filter="url(#shadow)">
<rect x="250" y="205" width="500" height="130" rx="12" fill="url(#serverGrad)"/>
<text x="500" y="237" text-anchor="middle" font-family="Arial, sans-serif" font-size="16" font-weight="bold" fill="white">FrameworX ENTERPRISE</text>
<text x="500" y="260" text-anchor="middle" font-family="Arial, sans-serif" font-size="12" fill="#bee3f8">Unified Control Platform</text>
<!-- Two server boxes inside -->
<rect x="290" y="275" width="140" height="45" rx="6" fill="white" fill-opacity="0.2"/>
<text x="360" y="295" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" fill="white">Primary Server</text>
<text x="360" y="311" text-anchor="middle" font-family="Arial, sans-serif" font-size="9" fill="#c6f6d5">Active</text>
<rect x="570" y="275" width="140" height="45" rx="6" fill="white" fill-opacity="0.2"/>
<text x="640" y="295" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" fill="white">Backup Server</text>
<text x="640" y="311" text-anchor="middle" font-family="Arial, sans-serif" font-size="9" fill="#fefcbf">Standby</text>
<!-- Sync arrows between servers -->
<g fill="none" stroke="white" stroke-width="1.5" stroke-linecap="round">
<path d="M438 290 L560 290 M552 285 L560 290 L552 295"/>
<path d="M560 307 L438 307 M446 302 L438 307 L446 312"/>
</g>
</g>
<!-- Down arrow to communication layer -->
<g fill="none" stroke="#4a5568" stroke-width="3" stroke-linecap="round" stroke-linejoin="round">
<path d="M500 340 L500 380 M488 368 L500 380 L512 368"/>
</g>
<text x="530" y="365" font-family="Arial, sans-serif" font-size="11" fill="#718096">Data Collection</text>
<!-- LAYER 3: Communication Protocols -->
<g filter="url(#shadow)">
<rect x="40" y="390" width="940" height="70" rx="10" fill="url(#protocolGrad)"/>
<text x="500" y="420" text-anchor="middle" font-family="Arial, sans-serif" font-size="14" font-weight="bold" fill="white">COMMUNICATION LAYER</text>
<text x="500" y="445" text-anchor="middle" font-family="Arial, sans-serif" font-size="12" fill="#feebc8">Modbus TCP | OPC UA | SNMP | Verbainfo | PLCs</text>
</g>
<!-- Down arrows to field devices -->
<g fill="none" stroke="#4a5568" stroke-width="2.5" stroke-linecap="round" stroke-linejoin="round">
<path d="M90 465 L90 495 M82 487 L90 495 L98 487"/>
<path d="M210 465 L210 495 M202 487 L210 495 L218 487"/>
<path d="M330 465 L330 495 M322 487 L330 495 L338 487"/>
<path d="M450 465 L450 495 M442 487 L450 495 L458 487"/>
<path d="M570 465 L570 495 M562 487 L570 495 L578 487"/>
<path d="M690 465 L690 495 M682 487 L690 495 L698 487"/>
<path d="M810 465 L810 495 M802 487 L810 495 L818 487"/>
<path d="M930 465 L930 495 M922 487 L930 495 L938 487"/>
</g>
<!-- LAYER 4: Field Devices (Bottom) -->
<text x="500" y="520" text-anchor="middle" font-family="Arial, sans-serif" font-size="14" font-weight="bold" fill="#2f855a">FIELD DEVICES</text>
<g filter="url(#shadow)">
<rect x="40" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="90" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Ventilation</text>
<rect x="160" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="210" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Traffic</text>
<rect x="280" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="330" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Toll Gates</text>
<rect x="400" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="450" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Cameras</text>
<rect x="520" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="570" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">HVAC</text>
<rect x="640" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="690" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Substations</text>
<rect x="760" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="810" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">Emergency</text>
<rect x="880" y="530" width="100" height="60" rx="8" fill="url(#fieldGrad)"/>
<text x="930" y="565" text-anchor="middle" font-family="Arial, sans-serif" font-size="11" font-weight="bold" fill="white">VMS / PA</text>
</g>
<!-- Feedback arrows going back up -->
<g fill="none" stroke="#805ad5" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" stroke-dasharray="6,4">
<path d="M245 105 Q120 285 170 505"/>
<path d="M755 105 Q880 285 830 505"/>
</g>
<!-- Chevron heads for feedback arrows -->
<g fill="none" stroke="#805ad5" stroke-width="2" stroke-linecap="round" stroke-linejoin="round">
<path d="M164 497 L170 505 L178 499"/>
<path d="M822 499 L830 505 L836 497"/>
</g>
<!-- Labels for feedback -->
<text x="95" y="305" font-family="Arial, sans-serif" font-size="11" fill="#805ad5" transform="rotate(-90, 95, 305)">Control Commands</text>
<!-- Legend -->
<g transform="translate(350, 620)">
<rect x="0" y="0" width="300" height="25" rx="5" fill="#edf2f7"/>
<circle cx="30" cy="12" r="6" fill="#48bb78"/>
<text x="45" y="16" font-family="Arial, sans-serif" font-size="10" fill="#4a5568">Data Source</text>
<path d="M110 12 L140 12 M132 7 L140 12 L132 17" fill="none" stroke="#4a5568" stroke-width="2" stroke-linecap="round" stroke-linejoin="round"/>
<text x="150" y="16" font-family="Arial, sans-serif" font-size="10" fill="#4a5568">Flow</text>
<path d="M195 12 L225 12" fill="none" stroke="#805ad5" stroke-width="2" stroke-dasharray="4,3"/>
<text x="235" y="16" font-family="Arial, sans-serif" font-size="10" fill="#4a5568">Control</text>
</g>
</svg> |
| Metric | Value |
|---|---|
| Total Tags | 413,882 |
| Communication Points | 85,400 |
| Integrated Cameras | 1,605 (organized in 83 groups) |
| Operator Screens | 261 displays |
| Active Alarms | 71,833 |
| Protocols | 7 across 56 channels |
| Running Scripts/Tasks | 26 |
| PLCs | 19 Altus controllers |
| Concurrent Users | Average 10 operators (unlimited license) |
| Protocol | Application |
|---|---|
| Modbus TCP | PLCs, field devices |
| OPC UA | System integration |
| SNMP | Network equipment, cameras |
| Verbainfo | Specialized highway systems |
| Others | 3 additional protocols |
| Subsystem | Function |
|---|---|
| Ventilation Control | Tunnel air quality and flow management |
| Traffic Management | Semaphore control and traffic flow optimization |
| Toll Operations | Gate control and transaction monitoring |
| Video Surveillance | 1,605 cameras with group management |
| HVAC Systems | Environmental control for facilities |
| Utilities Management | Treatment stations and electrical substations |
| Emergency Systems | Emergency phones and response coordination |
| Information Systems | Variable message signs (PMV) for driver information |
| Access Control | Security throughout the highway |
| PA Systems | Public address and emergency announcements |
| Electrical Substations | Power distribution monitoring |
Servers:
Operations:
FrameworX capabilities that made this solution possible:
| Capability | Application |
|---|---|
| Massive Tag Management | Handling 413,882 tags with real-time performance across distributed systems |
| Multi-Protocol Support | Native integration of 7 protocols (Modbus TCP, OPC UA, SNMP, Verbainfo) through 56 channels |
| Enterprise Redundancy | Dual-server architecture ensuring 100% availability for critical infrastructure |
| Scalable Visualization | Supporting 261 operator screens with unlimited client connections |
| Advanced Alarm Management | Processing and prioritizing 71,833 alarms across all subsystems |
| Camera Integration | 1,605 cameras organized in 83 groups with unified management |
Subsystem Unification
Traditional highway operations use separate control systems for each subsystem — traffic, ventilation, toll, cameras. This creates coordination delays during incidents. A unified platform enables automated cross-subsystem responses: tunnel incident triggers ventilation, variable signs, and emergency notifications simultaneously.
Scale Without Complexity
400k+ tags across 11 subsystems could require multiple specialized platforms. Native multi-protocol support (7 protocols, 56 channels) enables single-platform integration without middleware layers or protocol converters.
This case demonstrates large-scale infrastructure operations with multi-subsystem integration, massive tag counts, and enterprise redundancy for safety-critical highway management.